TO Cerak – delivery of industrial valves and actuators for boiler room reconstruction
The TO Cerak project involved the delivery of industrial valves and related equipment for the reconstruction of the boiler room at the Cerak heating plant in Belgrade.
The project delivered 358 Vexve Oy ball valves, sizes DN15–DN700, pressure class PN25, as well as 35 Adams Armaturen butterfly valves, sizes DN80–DN800, pressure class PN25.
In addition to the valves, the project included the delivery of Auma electric actuators, check valves, compensators and control valves, in accordance with the technical requirements of the heating plant reconstruction.