Pančevo Gas Pipeline – turnkey construction of a DN500 gas pipeline
The Pančevo Gas Pipeline project involved the execution of mechanical, civil and cathodic protection works for the construction of a gas pipeline with a nominal diameter of DN500..
The works were carried out along the pipeline route from MS3 to the Pančevo gas metering/regulating station (GRČ), on a, po principu turnkey basis— meaning full project delivery through the coordination of the technical, civil and protective works needed for the reliable and safe operation of the gas pipeline infrastructure.